Project Title Construction Project of Bandar Abbas / Sirjan/Rafsanjan pipeline
Goals Construction of the terminal and pumping stations of Bandar Abbas / Sirjan / Rafsanjan new 26-inch pipeline for the transfer of gasoline, kerosene and diesel oil from the Persian Gulf Star refinery to the central regions of the country
Job Description - Construction of a new pumping station in Bandar Abbas for the 26-inch pipeline with a capacity of 300,000 barrels per day - Construction of a new pumping station in Qotbabad for the 26-inch pipeline with a capacity of 300,000 barrels per day - Construction of a new pumping station in Mehraran for the 26-inch pipeline with a capacity of 300,000 barrels per day - Construction of a new terminal in Rafsanjan for the 26-inch pipeline with a capacity of 300,000 barrels per day - Construction of a new terminal in Sirjan for the 8-inch pipeline with a capacity of 35,000 barrels per day - Engineering (E): Preparation of documents and technical specifications, procurement engineering, documents and maps required for project implementation and commissioning: 1,900 documents - Purchase and procurement of goods and materials (P): 61 items - Executive operations (C): - Supply and installation of 18 electric pumps and 3 diesel devices each with an electric power of about 4 MW - Supply and installation of variable-frequency drive (VFD) systems for an increase in energy efficiency - Design and installation of leak detection system (LDS) for 459 km of the 26-inch pipeline
Title Capital Rial Capital: In Local Currency: 1,520 billion Rials

Foreign Capital: In Foreign Currency: € 45.6 million
Employer NIOEC
Project Managment NIOEC
Contractors Consortium of RAMPCO Group & Energy Industries Engineering & Design (EIED)
Consultant Pars Consulting Engineers
Contract Type EPC