Goals
- Increase in transfer capacity of petroleum products from Abadan to Nezamiyeh in Ahvaz up to 250,000 barrels per day
- Increase in transfer capacity of petroleum products from Shazand to Rey up to 300,000 barrels per day
Job Description
Construction of a 26-inch pipeline from Abadan oil refinery to Nezamiyeh of Ahvaz, and from Shazand of Arak to Tehran with a length of 428 km
Construction of a pipeline from Abadan to Nezamiyeh of Ahvaz with a capacity of 250,000 barrels per day
Construction of a pipeline from Shazand to Rey with a capacity of 300,000 barrels per day
Construction of the equipment required in Shazand, Qom and Rey stations for operation