Construction of Bandar Abbas Oil Refinery

- Construction process from 1993 to 1999 - Nominal capacity of 232,000 barrels - Including vacuum distillation (No. 1 & 2), atmospheric distillation, visbreaking, liquefied petroleum gas production, kerosene hydro-treating, heavy naphtha hydro-treating, continuous catalytic reforming, nitrogen generation, hydrocracking, blown bitumen production, sulfur production, amine gas treatment, sour water stripping, water production, electricity, steam and compressed air and feed tanks, and intermediate and final products units

Last Update Page: 11/8/2023